Rock face


This is the rock we're using for Crushed Base and Surfacing (AC20 and AC14). It originates from limestone. Its strength is around 140kN to 150kN, slightly sound rock for these works.
The only draw backs i can imagine is its non-homogeneity nature. A lot of unsuitable/foreign materials were found within this rock mass, as can be seen in this picture there are some soil and dirt inside it.
But it is good if sampled well.
Posted by Picasa

Wednesday, May 18, 2011

Preparation of pile cap



Preparation for blinding for pile cap for Abutment at Ndoyo Bridge is underway, the area has been levelled, cleaned and checked
Posted by Picasa

Wednesday, March 30, 2011

Subbase preparation

Laying subbase (stabilised layer to C1 quality) at 10+600 Tanga-Horohoro road. Seen in picture are roller, paver, water bouser and grader

Sunday, March 27, 2011

Pile Load Testing

This is an assembly of Pile Load Test by method of "Maintained Load Test" whereby a constant load is maintained until no significant settlements are recorded then a load is changed, and process is repeated till specified load.

Sunday, March 20, 2011

Intro

Hello readers,
You are welcome to participate in this blog, I will keep on writing to you what I think is important concerning Tech, Computer, Software and engineering works.

In short these are my favourites.
So Keep on posting your comments
Robert.